Lesson 101: Setting up and operating a test facility for HPHT equipment, read our latest blog > bit.ly/TestFacilityHPHT

Lesson 101: Setting up and operating a test facility for HPHT equipment, read our latest blog > bit.ly/TestFacilityHPHT

Blog | Lesson 101: Setting Up And Operating A Test Facility For HPHT Equipment

Coiled Tubing Drilling is increasing in demand which is creating the need for tools to have higher downhole capabilities. …read more

Source:: bit.ly/TestFacilityHPHT” >FB-RSS feed for AnTech

A (Quick) Guide to Hiring an Aerial Land Surveyor for a Pipeline Project

CTA-Landpoint-UAV

Completing a land survey is one of the biggest challenges a project leader will face in the runup to a pipeline construction project. The survey must be quick, accurate, and <img data-avia-tooltip="Landpoint team preparing drone for flight" src="http://www.landpoint.net/wp-content/uploads/2017/02/Drones-for-Pipeline-Surveying-495×400.jpg?13a4d3" width="495" …read more

Source:: Landpoint – Surveying, Engineering, and Technical Services

Emily Blackman explains API 6A in our latest blog! > bit.ly/API6APartOne

Emily Blackman explains API 6A in our latest blog! > bit.ly/API6APartOne

Blog | An Introduction To API 6A For Surface Equipment: Part One

‘ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies’. International Standards are drafted in accordance with the rules stated in the ISO/IEC Directives. …read more

Source:: bit.ly/API6APartOne” >FB-RSS feed for AnTech

Tricky Dick and Me

The Friday before Election Day 1972, the Nixon campaign scheduled a last-minute whistle stop rally in a huge hangar at the Tulsa airport. It was my junior year; school let out early, so I hitched a ride home (I thought). My friends thought it would be a great idea to go see the President. Super.

The problem was, the rally (Read more...)


Source: Maley's Energy Blog